en
RU KZ

Head of CSA and MPR department (Civil, Structural and Architectural department and Master plan and roads)

6858
The vacancy is closed!
Type Contract
Country Kazakhstan
Work Method 5-day work week (40 hours)
Contact Shynar Urynbaeva
E-mail recruit@bolashak.com
Job Description
Job Requirements
Terms and Conditions
-Manage the development of Method Statement, Feasibility study and calculations as well as scheduling, design task assignments, engineering and survey works cost estimate; -Perform technical management of task assignment by employees within the established schedule providing timely work load, eliminating conflicts on principle issues; Check and sign all design estimate (survey) documentation issued by the Team; -Control the quality and timeliness of technical documentation preparation, conformity of project equipment with specifications. -Maintain systematic work on improvement of labor efficiency of employees within department. -Ensure timely provision of required materials, inventory and equipment for the team. -Provide task assignments and input data from Project Managers for execution of design (engineering survey) works, issuance of tasks with indication of facilities, due dates and cost of work;
∙ Higher technical education. ∙ Experience in the field of construction in a managerial position of 5 years or more. ∙ Lead the development of work methodology, feasibility studies, calculations, and network schedules. feasibility studies and calculations, as well as the preparation of network schedules, tasks for the design assignments, estimates for design and survey work. ∙ Provide technical leadership in the execution of tasks by employees within the the established deadlines, ensuring timely proper coordination in the work, eliminating arising disagreements on issues of principle.
Atyrau 5/2 for KZ passport holders

Bolashak news

Stand as one
Bolashak Group has not stood aside and continues to work on helping those affected by the terrible natural disaster - floods.
Kazakhstan Conference KazDrilling 2024
On April 2, 2024 Kazakhstan Conference KazDrilling: Upstream dedicated to geology, drilling and improvement of hydrocarbon production in Kazakhstan was held for the second time in Atyrau.
Each year, since 1948, World Health Day is celebrated on April 7
This day has acquired special significance after the pandemic.
Nauryz in Bolashak-Atyrau
Nauryz is the oldest national holiday, which is tied to seasonal changes in nature.
Women’s Day in Bolashak-Atyrau
The Day of gratitude
The vital activity of any Company cannot be limited only to professional areas.