en
RU KZ

Underground (UG) Designer – Site

8175
Opening date 09.11.2026
Closing date 23.11.2026
Type Contract
Country Kazakhstan
Work Method 5-day work week (40 hours)
Contact Saida Akhmetova
E-mail recruit@bolashak.com
Apply for this position
Job Description
Job Requirements
Terms and Conditions
Strong experience in AVEVA E3D, particularly in Underground systems Ability to work directly with the 3D model and extract the required engineering information Extraction and preparation of UG drawings from the 3D model Preparation and extraction of longitudinal profiles for underground networks Ability to identify and manage coordinates, elevations, slopes, crossings and interferences Preparation and update of drawings and documentation required to support construction activities at Site Coordination with Engineering and Construction teams to resolve UG design issues and field queries Familiarity with GOST standards applicable to Civil/Underground design and construction is highly desirable Previous experience in EPC projects and Site/Construction support will be highly valued
Experienced UG/Civil Designer with strong AVEVA E3D skills, construction-oriented approach and ability to work independently at Site
Karabatan 5/2, for KZ passport holders

Bolashak news

CAREER START WITH BOLASHAK GROUP
Bolashak Group held Career Start workshops for 3rd and 4th year students at APEC Petrotechnic Higher College to help them prepare for their first job search.
BOLASHAK GROUP AT ANNIVERSARY KIOGE-2026
Bolashak Group representatives attended the 30th anniversary KIOGE-2026 International Oil & Gas Exhibition in Almaty and met with partners in QA/QC services, personnel management and certified training.
TEAMBUILDING RECAP
Strong teams are built through shared experience, trust and the ability to move towards the same goal.
BOLASHAK GROUP AT PETROMAINTENANCE 2026
Bolashak Group representatives joined PetroMaintenance 2026, an annual professional forum dedicated to Maintenance, Reliability and Asset Integrity across Kazakhstan’s Oil, Gas and Petrochemical sectors.
KAZDRILLING 2026: A MEETING POINT FOR THE INDUSTRY
Ahead of Oil & Gas Workers’ Day, Atyrau once again brought together the industry community at the 3rd annual KAZDRILLING 2026 conference.
PEOPLE POWERING THE NEW INDUSTRIAL ERA
Bolashak Group continues its long-standing participation in PetroHR 2026, an annual forum bringing together key players across Kazakhstan’s Oil & Gas sector.